| 1. | Dewatering and drainage design for deep foundation pit excavation 深基坑开挖降排水设计 |
| 2. | Numerical simulation of deep foundation pit excavation with double - row piles 深基坑开挖中双排桩支护的的三维有限元模拟 |
| 3. | Drotective mearures taken for pile foundation in the foundation pit excavation of 上海科技城深大基坑开挖时对桩基的保护措施 |
| 4. | Field observation and analysis on soil pressures of pit walls in foundation pit excavation 基坑开挖坑壁土压力原位监测与分析 |
| 5. | Foundation pit supporting structure and deep foundation pit excavation of zhuhai port square 珠海口岸广场支护结构与深基坑开挖 |
| 6. | Study on calculation of deformation of underground pipework caused by deep pit excavation 深基坑开挖诱发地下管网形变计算方法的研究 |
| 7. | Influence of ecoenvironment and the problem to be solved due to open pit excavation 露天煤矿开采对生态环境的影响及其亟待解决的问题 |
| 8. | Study of land subsidence caused by from groundwater lowering during deep foundation pit excavation 深基坑开挖降水导致地面沉降机理研究 |
| 9. | Simulating of an actual foundation pit excavation with three - dimensional elastic - plastic finite element method 基坑开挖的三维弹塑性有限元模拟 |
| 10. | Study on tree - root pile applied to foundation pit excavation support for existing factory plant under special geologic conditions 树根桩围护在老厂房内特殊条件下的施工研究 |